Language: English
ISBN/ISSN: 7550905614
Published on: 2013-10
Paperback
Studies on Modern Technology of Rock-fill Dam Construction and Hydropower Development 李菊根主编的《堆石坝建设和水电开发的技术进展(英文版)》全面阐述了中国境内水库大坝建设取得的成就与积累的经验,由多名从事水库建设和水电开发的行业专家从不同侧面,展示了新技术、新材料、新工艺与现代管理理论在水工建筑物中的应用,同时对大坝建设和水电开发的技术进展进行探讨。
Preface IPreface lIInnovation and Application of Key Technologies for Xiaowan Arch DamRole of Hydropower in Climate Change Mitigation and AdaptationSustainable Development of Hydropower in Lancang River BasinRockfill Deformability-Discussion on the Behavior of Brazilian Rockfill DamsLeading the World through Promoting New Techniques in Dam Construction Actively and PrudentlyIntroduction of Vertical Drains as a Safety Measure for Concrete Face Dams(CFRDs) with NewMaterials Located in Seismic AreasNew Type of Dam-Cemented Material Dam and Cuvrrent Research Progress RelatedUnderwater Rehabilitation of a 113 m High CFRD: Experiences from TurimiquireEvolution Mechanism of Spatial-Time Characteristics of High Arch DamMonitoring and Inspection of Hydropower Stations and Dams with Unmanned Underwater VehiclesMain Technical Innovation and Practice in Nuozhadu Hydropower Station EngineeringMonitoring Data Analysis and Discussion on Downstream Atomiztion of FloodDischarge of the Pubugou Dam on the Dadu RiverTopic 1 Cases and Engineering Experiences of Rock_fill Darns Design Research and Practice on Impervious Materials for the Core Wall of Nuozhadu Rockfill Dam Chaglla CFRD-Main Design Features Study on Key Technical Issues of the High Clay Core Rockfill Dam of Lianghekou Hydropower Station Emborcagao Dam Stress-Strain Behavior in 28 Years of Operation Construction Techniques of Nuozhadu Core Rockfill Dam Evaluation of Design and Construction Performance of Concrete Faced Rock-fill (CFRD) of Maiaojiaba Hydropower Station Research on Key Techniques for Concrete-faced Rockfill Dam of Liyang PSPS Upper Reservoir Risk Analysis of Construction Diversion during Initial Stage for Lianghekou Hydropower Project in Yalong River Study on Treatment of Sand Layers in Foundation of Changheba Gravel Soil Core Wall Rockfill Dam Design of High CFRD for Jiangpinghe Hydropower StationTopic 2 Design and Analysis of Rockfill Dams Research on Design Principles of the Ultra High Concrete Faced Rockfill Dams Study on Life-cycle Safety and Quality Management of High Earth-rock Dam Project: a Case Study Seismic Design and Analysis Aspects of Large Earth Core Rockfill Dam Located in a Narrow Canyon with Multiple Seismic Hazards Design of Nuozhadu Core Rockfill Dam Numerical Analysis of High CFRD Taking Into Account the Scale Effect by Using an Elastoplastic Constitutive Model L&K-Enroch Key Technique Research of Concrete Face Rock:fill Dam Based on Deep Overburden Layer and Strong Unloading Rockmass Research and Designing on Initial Water Impoundment Speed of Nuozadu High Core Wall Rock Fill Dam Three-dimensional Cellular Automata Based Particle Flow Simulations on Mechanical Properties of Talus Deposit Evaluation Aspects and Criteria of Maximum Aseismic Capability for High Earth-rock DamTopic 3 Material and Construction Method of Rockfill Dams Ilisu Dam and Hepp Selection and Evaluation of Embankment Material Design for Mix Proportion and Construction of Asphalt Concrete Facing Slab in Cold Region Splitting and Direct Tensile Strength Tests for Earth-Core Material Studies on Creep Behaviors of Lianghekou Rockfill by Triaxial Tests Semi-positive Cutoffs for Embankment Dams Treatment Design of Deep Overburden of Concrete Faced Rock-fill Dam Foundation and Evaluation of Its Validity Study on Characteristics of Moraine Conglomerate in Building Jiangpinghe CFRD Study on Optimization of High Concrete Face Rockfill Dam Filling Procedure The Applications and Developments of High Earth-rock Dam Digital Control Construction Technology Abnormal Behavior of Wawushan Dam Face Slab Caused by Inverted Water Pressure During Construction The Fast Filling & Constructing of High Concrete Faced Rock-fill Dam in Narrow SpaceTopic 4 Operation, Maintenance and Monitoring of Rockfill Dams A Statistical Method for Evaluating Leakage of CFRDs The Application of InSAR for Satellite Based Monitoring of Dams Displacement Forecasting Models with Impoundment Factors for High CFRDs Rockfill Dam Settlement Data: Processing and Statistical Analysis Research on Damage Causes of Construction Joints of Sanbanxi Concrete Face Rock-fill Dam Seepage and Leakage Detection in Dams Parameters' Sensitivity Analysis and Computation of the Embankment Dam and its Application to Inversion and Locations Optimization of Displacement Monitoring Points Analysis of Baoping Concrete Face Rockfill Dam Infiltrating Status in Early Storage Period Preliminary Study on the Piezometer Installation in Miaowei Geomembrane-core Rockfill Cofferdam The Design and Practice of Safety Monitoring System for Nuozhadu High Core Wall Rockfill DamTopic 5 Sustainable Development of Hydropower and Environment-friendly Technologies for Dam Construction Analysis of Hydro.power Plant Platform Concept as a Synergy Element between Hydroelectricity and Brazilian Amazon Region Sustainable Development Strengthen Science and Technology Innovation on Environmental Protection, Construct Beautiful Three Gorges Reservoir Area Building the Future: the Revival of Dam Building in Afghanistan Sayed Karim Ghalgi Mohammad Hakim Qazizadah Abdulelah and Ghafoori Mohammad Naim Study on Impervious and Protective Measures for Shoukoubao CSG Dam Sustainable Reservoir Sediment Management for Siting, Design and Operation of Hydropower Dams Solution to Resettlement of Hydropower Project Affected People Based upon National and Provincial Conditions Concrete Dams for Sustainable Development in the 21st Century Effect of Different FCLL Regulation Scenarios of the Three Gorges Project on Dam Navigation An Experimental Study for Dam Operation on Power House Construction in Chungpyong Dam Management and Practice on Environmental Protection in Construction Period of Longkaikou Hydropower Station Application of Multi-beam Sounding Technology in Security Management of Reservoir at Manwan Hydropower Station Study on Mechanism of the Carbon Cycle and Greenhouse Effect of Hydropower Resources Informatization Situation and Challenges in Hydropower Project Construction Phase Application of Rock-Filled Concrete Technique in Hydraulic and Hydropower Engineering Preliminary Study on the Performance of Continuous Sliding Mixing Equipment for CSGTopic 6 Design and Construction of High Dams Towards a 300 m High CFRD Research on Key Technology for Safe Operation of 300-m Grade Arch Dam During Reservoir Impoanding Some Relevant Aspects of Geotechnical Design for "La Yesca" Dam: Description of its Behavior During the Construction Stage and First Filling After One Year of Built Santo Ant6nio Hpp River Diversion-Inovattive Solution for Cofferdam Construction to Anticipate Power Generation Damage Modeling of a Cemented Sand and Gravel Dam in China Cofferdams and Rockfill Embankments as Temporary River Diversion Structures-Challenges and Risks Design and Application of Real-Time Roller Compacted Quality Monitoring System in Longkaikou Hydropower Station Numerical Simulation Research on the Hydraulic Characteristics of Multi-horizontal Submerged Jets Rolled Asphalt Concrete Construction Technology in Winter The Concrete Expansion Phenomenon in a Concrete Gravity DamTopic 7 Dam Safety assessment and Rehabilitation Technology Super-Deep Cut- Offs to Improve Inadequate Foundation and to Repair High Dams Aging Modes and Remedial Measures for Concrete Dams Design of Temperature Crack Treatment of Xiaowan Dam Development of Methodology for Partially Automated Hydropower Potential Calculations Using GIS-Technologies Evaluation of High Slope Stability at Arch Dam Abutment Based on Internal Monitoring Data Karun i Hydropower Plant Rehabilitation Project in Iran, Turbine Repair and Refurbishment The Study of Key Issue Consolidarion Grouting's Design in Arch Dam of Dagangshan Hydropower Station Naussac Dam(france) : Aginf of the Upstream Concrete Face: Detection, looking for Leaks and Repair Study on Variable-weight Exponential Smoothing Forecasting Model of Dam Slope Research on the Key Technology & Its Application to Reinforcement Project Post-evaluation for Dangerously Weak Dams The Numerical Simulation of Aerated Cavity Length and Negative Pressure on Stepped Spillway Combined with Y-shape Asymmetrical Flaring Gate Pier Experimentation of Composite Contact Grouting Technology for Hydraulic Steel Lining at Jinghong Hydropower Station Disposing the Major Security Threats During Construction in Zhexi Expansion Project
作者介绍