The China Contimental Scientific Drilling Project

中国大陆科学钻探工程(英文版)

Price: $151.00


Qty. 

Author: Da-Wang
Language: English
ISBN/ISSN: 9787030435927
Published on: 2015-04
Paperback

This book comprchensively introduces Lhc ciriUing theory anci practice behind CCSD- l weIJ drilling,the first stage of a key national scientific cnginecring projcct of China. In addition to access to varietyofdata and information accumulated ciecade ciuring the projccfs ciecade-long operation, readers alsogain insight into stzitc-of-thc-art techniques anci most rccent achievements in China′s scientific drillingindustry. Spccifically, this Work introduces t he crilling engineering design, well site const ruction, andcquipmcnt and c-on.struction situation. It also provides a minute descscription on the new techniqucsthat werc developed f'or tackling the tcchnical difficulties, expounds in cictail the core drillingtcchiiiques for hard rock deep well, and treats ciiamond core drill bits, reaming drilling techniqucs inhard crystalline rocks, well-deviation control techniques for strong dipping strata, and much more. Insummary, this book offers a valuable resource for engineers and technic-ians who engage in scientiticdrilling and a variety of resource drilling engincering; teachers and students who are interested inthis field will also gain plentiful information. Prof. Da Wang, the fornier deputy dircctor of ChinaGeological Survey, was the ctircctor of the Engineering Ccntrc, chief cnginecr and drill-site generaldirector of China continental Scicntific Driiling Project.



Background
1.1 Scientific Drilling-A New Field of Earth Science
1.2 A Brief Introduction of China Continental Scientific Drilling Project
1.3 Site Selection and Scientific and Technological Objectives
1.4 Developing History of CCSD Engineering
1.4.1 Early Stage of Understanding (Before 1991)
1.4.2 Project Argumentation and Demonstration Stage(1991-September 1999)
1.4.3 Project Preparation Stage (September 1999-June 2001)
1.4.4 Project Implementation Stage (June 2001-April 2005)
1.5 Technical Preparation
1.5.1 Technical Training
1.5.2 Pre-pilot Hole Construction
1.5.3 Pre-research on Key Technologies
2 Drilling Engineering Design
2.1 Assignment of Drilling
2.2 Basic Situation of the Well Site
2.2.1 Forecast of Lithological Profile of the Formation Encountered
2.3 Lithologic Characteristic of the Rock Formations to be Encountered by Drilling
2.4 Drilling Technical Program
2.4.1 Combined Drilling Techniques
2.4.2 Flexible Double Hole Program
2.4.3 Feel Ahead Open Hole Drilling Techniques
2.5 Borehole Structure and Casing Program
2.5.1 Designed Borehole Structure and Casing Program for the Pilot Hole
2.5.2 Designed Borehole Structure and Casing Program for the Main Hole
2.6 Drilling Equipment Program
2.6.1 Main Drilling Equipment
2.6.2 Equipment and Instruments Should Be Added
2.7 Drilling String Program
2.8 Core Drilling Program
2.8.1 Wireline Core Drilling
2.8.2 Hydro-hammer Wireline Core Drilling Tool
2.8.3 PDM Wireline Core Drilling Tool
2.8.4 Turbomotor Wireline Core Drilling Tool
2.8.5 Conventional Core Drilling Tool
2.8.6 Hydro-hammer Core Drilling Tool
2.8.7 PDM Core Dnilling Tool
2.8.8 Design Program of Diamond Core Drill Bit and Reaming Shell
2.9 Hole Deviation Control Program
2.9.1 Deviation Prevention for Cored Hole Section and Monitor Measures
2.9.2 Deviation Control Measure for Cored Hole Section
2.9.3 Deviation Control Measure for the Upper Section of the Main Hole Where Non-core Drilling Was Conduci
2.10 Non-core Drilling and Reaming Drilling Program
2.10.1 Design of Drilling Tool Assembly For Non-core Drilling
2.10.2 Design of Drilling Tool Assembly for Reaming Drilling
2.10.3 Selection of Non-core Drill Bit
2.10.4 Design of Reaming Drill Bit
2.11 Drilling Fluid Technique and Solid Control Program
2.11.1 The Main Technical Problems Should Be Considered
2.11.2 Design of Drilling Fluid Type
2.11.3 Solid Control
2.12 Well Cementation and Completion Program
2.12.1 Well Cementation Program
2.12.2 Principle in Design of Casing String Strength
2.12.3 Well Completion Operation
2.13 Design of Moving Casing
2.13.1 Necessity of Adopting Moving Casing Design
2.13.2 Fixing of Moving Casing
2.13.3 Safety Management of Moving Casing
2.14 Time and Cost Estimation
2.14.1 Designed Construction Progress
2.14.2 Budgetary Estimation of Cost
2.15 Change and Modification of Design Well Site and Drilling Equipment
3.1 Well Site
3.2 Drilling Equipment
3.2,1 ZJ70D Drill Rig
3.2.2 Drill Rig Reconstruction
3.2.3 The Power System
3.2.4 Corollary Equipment
3.2.5 Application Evaluation on ZJ70D Drill Rig Construction Situation
4.1 Basic Situation of the Construction of CCSD-1 Well
4.1.1 The Basic Data
4.1.2 Drill Hole Trajectory
4.1.3 Well Temperature Curve
4.2 Simple Situation of the Construction at Different Periods
4.2.1 Hole Opening and Non-core Drilling (the First Opening)
4.2.2 Pilot Hole (Section CCSD-PH) Core Drilling (the Second Opening)
4.2.3 The First Expanding Drilling of the Main Hole (Hole Section CCSD-MH-1K) ,
4.2.4 The First Core Drilling of the Main Hole (Hole Section CCSD-MH, the Third Hole Opening)
4.2.5 The First Sidetracking (Deviation Correction) Drilling of the Main Hole
……
5 Hard Rock Deep Well Core Drilling Techniques
6 Diamond Core Drill Bit
7 Reaming Drilling Tecluuques of Hard Crystalline Rock
8 Well-Deviation Control Techruques for Strong Dipping Strata
9 Drilling Fluids and Solids Control Technology
10 Casing and Well Cementation
11 Drilling Data Acquisition
12 Technical Economical Analysis
References


Sorry we ran out!

Fill out this form and we will let you know when it comes back in stock

Copyright © 2024 China Scientific Books.