Runyang Yangtze River Road Bridge Construction (Vol.4)—Cable-stayed Bridge

润扬长江公路大桥建设 (第四册)— 斜拉桥

Price: $37.00


Qty. 

Author: By Wu Shengdong
Language: Chinese
ISBN/ISSN: 7114054599
Published on: 2005-01
Hardcover

Beicha cable-stayed bridge of Runyang Yangtze river road bridge is a twin-tower ,double cableplane,steel box girder cable-stayed bridge,in which the technical content of design,engineering and engineering control is low and the difficulty is relatively large .This volume details the relevant technical contents of design and engineering of the cable-bridge.It consists of 3 pieces ,of which the first piece contains 3 chapters,they mainly introduce manufacturing ,processing ,transporting and on-site welding & soldering of steel box girder ;the third piece contains 3 chapters ,they mainly introduce organization & management and key technologies in the field engineering of the stayed-cable bridge ,such as deep water foundation engineering ,pile cap engineering ,cable support tower engineering ,erection of deck loop wheel machine ,hoisting & jointing of steel box girder sections and installatin & erection of stayed cables.
The book not only suits engineering and technical professionals engaging in large-scale bridge design ,engineering ,supervision and construction management ,but also students majoring in bridge engineering and other related majors in universities and colleges.


Sorry we ran out!

Fill out this form and we will let you know when it comes back in stock

Copyright © 2024 China Scientific Books.